🤖 AI Summary
研究通过控制软件工程任务实验,探讨了AI生产过程中信息和资源约束对推理能力的影响,揭示了不同规划方式下的成功率变化。
📝 Abstract
The economic value of inference depends on how capacity and task information are distributed across stages of AI production. We study these organizational margins using controlled workflow experiments on externally verified software-engineering tasks. In two matched resource panels, direct execution records the same success rate of 59.6 percent at logical-token ceilings of 12,000 and 24,000, while success under information-constrained planning rises from 36.2 to 51.2 percent. The planning disadvantage narrows by 15.0 percentage points (95 percent task-cluster bootstrap interval: 4.2 to 25.8). A strict read-only planning campaign varies whether the planner sees the task issue. At 12,000 tokens, issue access raises success by about 16 percentage points over issue-hidden planning. Compared with direct execution, task-informed planning is about 10 points lower at 12,000 tokens; at 24,000 tokens, it shows a 29.6-point advantage. In the resource panels, direct execution uses substantially less than either ceiling, while the planning workflow's binding rate falls from 46.2 to 0.8 percent and downstream execution accounts for 89.9 percent of the increase in total use. Scale determines the capacity available to a system; workflow and information structure shape the productive value